Heavy Civil Cost Data Africa
These Cost Books include the complete set of all Cost Book Categories in Drill Down Format covering Heavy Civil & Infrastructure Construction Africa. All costs are based on regional Labour, Fuel, Equipment & Material Costs. Equipment based production rates for the same equipment are generally comparable to North America. Equipment operator rates are much less & as a result there is a preference for using smaller equipment for the same activity that would utilize larger equipment in North America. Manhour factors are much higher as most craft tradesmen are accompanied by unskilled helpers which drives the activity manhour factors up. Labour rates range from $4-15 per hour with South Africa having the highest rates. Average fuel prices are comparable to North American fuel prices. Concrete material costs are approximately 30-50% of North American rates & Steel prices approximately 60-70% of North American rates. Lumber is more expensive than in North America.
Foundations &
Containment
Structures
ConstructionCost Assemblies
HCI-470
Cost Books
Level Up Your Game
If you've been looking for a way to bid projects more quickly and accurately, there has never been a better time to upgrade your database.Get Your Quote Now






























